Maintenance
[#1043] Maintenance Reload R2 DBA
Posted: 2025-08-26 19:29Start: 2025-08-27 02:00:00
End : 2025-08-27 05:00:00
Affects: Customer BGP DBA, Traffic DBA
Since our datacenters are setup with 2 routers to handle situations like these, only customers having only one BGP session would be affected. Customers having a redundant BGP session with us should not experience any issues.
[#1042] Maintenance Transit Arelion
Posted: 2025-07-28 16:07Start: 2025-08-15 00:00:00
End : 2025-08-15 05:00:00
Affects: Traffic towards Arelion
"Maintenance to perform software upgrade in order to resolve issue on router."
During this maintenance all Arelion traffic will be automatically rerouted over our other transits and peering connections.
2025-07-28 14:10 UTC
Update: Please note that the Service Window has been rescheduled.
[#1041] Darkfiber maintenance - NZS - EQX-AM7
Posted: 2025-04-08 18:22Start: 2025-05-09 00:00:00
End : 2025-05-09 06:00:00
Affects: Redundancy NZS
"This work is necessary to continue guaranteeing the high quality and reliability of our network.
We will make sure to minimize the duration of any impact on your connection(s)."
The connectivity between NZS and EQX-AM7 will automatically reroute over our ring.
Customers having wave service will be down during this time.
[#1040] Maintenance LevelFour
Posted: 2025-04-08 17:09Start: 2025-04-16 22:00:00
End : 2025-04-16 23:00:00
Affects: Internet Customers connected through LevelFour (formerly CrossNetworks)
"To improve the network, the connection is transferred to a new switch.
Interruption length: within 5 min."
During this maintenance we expect some downtime to occur for customers connected through LevelFour.
[#1037] Maintenance Power Feed Bytesnet
Posted: 2025-02-14 22:11Start: 2025-05-14 01:00:00
End : 2025-05-14 05:00:00
Affects: A-feed Power Bytesnet Rotterdam (BNR)
"In order to continue to guarantee proper operation, the circuit breakers are maintained every 5 years in accordance with supplier instructions. The maintenance of the A-feed is planned for this year."
During this maintenance any equipment in BNR that only has power from the A-feed would be powered off during these maintenance works.
- [#1043] 2025-08-26 » 2025-08-27 02:00 / 2025-08-27 05:00
- [#1042] 2025-07-28 » 2025-08-15 00:00 / 2025-08-15 05:00
- [#1041] 2025-04-08 » 2025-05-09 00:00 / 2025-05-09 06:00
- [#1040] 2025-04-08 » 2025-04-16 22:00 / 2025-04-16 23:00
- [#1037] 2025-02-14 » 2025-05-14 01:00 / 2025-05-14 05:00