Maintenance

[#1042] Maintenance Transit Arelion

Posted: 2025-07-28 16:07

Start: 2025-08-15 00:00:00
End : 2025-08-15 05:00:00

Affects: Traffic towards Arelion

Our transit provider Arelion has announced planned maintenance on their routers. Their reason is stated below:

"Maintenance to perform software upgrade in order to resolve issue on router."

During this maintenance all Arelion traffic will be automatically rerouted over our other transits and peering connections.

2025-07-28 14:10 UTC
Update: Please note that the Service Window has been rescheduled.

[#1041] Darkfiber maintenance - NZS - EQX-AM7

Posted: 2025-04-08 18:22

Start: 2025-05-09 00:00:00
End : 2025-05-09 06:00:00

Affects: Redundancy NZS

Darkfiber provider Eurofiber which connects Nedzone Steenbergen (NZS) towards Equinix-AM7 is having a planned maintenance.

"This work is necessary to continue guaranteeing the high quality and reliability of our network.
We will make sure to minimize the duration of any impact on your connection(s)."

The connectivity between NZS and EQX-AM7 will automatically reroute over our ring.

Customers having wave service will be down during this time.

[#1040] Maintenance LevelFour

Posted: 2025-04-08 17:09

Start: 2025-04-16 22:00:00
End : 2025-04-16 23:00:00

Affects: Internet Customers connected through LevelFour (formerly CrossNetworks)

Our interconnect provider LevelFour has announced planned maintenance. Their reason is stated below:

"To improve the network, the connection is transferred to a new switch.
Interruption length: within 5 min."

During this maintenance we expect some downtime to occur for customers connected through LevelFour.

[#1037] Maintenance Power Feed Bytesnet

Posted: 2025-02-14 22:11

Start: 2025-05-14 01:00:00
End : 2025-05-14 05:00:00

Affects: A-feed Power Bytesnet Rotterdam (BNR)

Our datacenter provider Bytesnet has announced planned maintenance on one of the power feeds in Bytesnet. Their reason is stated below:

"In order to continue to guarantee proper operation, the circuit breakers are maintained every 5 years in accordance with supplier instructions. The maintenance of the A-feed is planned for this year."

During this maintenance any equipment in BNR that only has power from the A-feed would be powered off during these maintenance works.

[#1036] Maintenance Transit Lumen/Colt

Posted: 2025-02-07 18:46

Start: 2025-03-06 00:00:00
End : 2025-03-06 06:00:00

Affects: Traffic towards Lumen/Colt

Our transit provider Colt has announced planned maintenance on their routers. Their reason is stated below:

"Work is required to complete the code upgrades on network devices to the Colt domain to ensure resilience, scalability and continued integrity of the network."

During this maintenance all Lumen/Colt traffic will be automatically rerouted over our other transits and peering connections.