Global Switch Amsterdam Black Building test (Maintenance)
« Back
[#816] Global Switch Amsterdam Black Building test (Maintenance)
Posted: 2019-07-26 07:16Start: 2019-11-02 08:00:00
End : 2019-11-02 11:00:00
Affects: Global Switch Amsterdam - at risk
The notification we received included the following:
The main purpose of this BBT is to test all full automatic functionality of all the emergency backup power systems, electrical distribution, and mechanical cooling systems.
- Before the works start all the technical installations will be checked. When there is a slight possibility for a failure or a deviant value (technically) the works won't start or will be aborted.
- The change level is assessed by GS OPS as a level 2 (Medium) as the supply by the main grid is shut down.
Their reference is: Change Control Form CCF2019-137
This is only an at risk notification, no outages are expected.